Change orders: how general contractors get paid for extra work

Only a third of contractors say their change order process works, and unsigned changes drain margin. Get changes priced and signed before work starts.

· Operations · 5 min read

A general contractor and superintendent review a printed change order together on a half-built site at blue hour.

Change orders: how general contractors get paid for extra work

Change orders are where many general contractors lose the margin they bid. The work gets done, the client agrees in a hallway conversation, and the paperwork arrives weeks later or never. A change order process that prices, signs and bills each change before work starts fixes most of that, and it takes less time than chasing payment after the job closes.

Where the margin leaks

Research from the last few years points the same way.

Study Who was surveyed Finding
Dodge Construction Network and Clearstory, 2026 Nationwide survey of US general and specialty trade contractors 96% of GCs say weak change order visibility affects their ability to control costs. 91% sometimes don't collect full change order amounts, most often over disputed pricing, incomplete documentation and scope disagreements.
FMI, 2026 243 executives and 84 project managers at general and specialty contractors GCs with highly effective change order processes met or beat project profit margins 68% of the time, against 61% for those with moderate or minimal processes.
Love et al., Production Planning and Control, 2019 98 construction projects worth $8.5 billion Only 67 of the 98 had client-approved change order data. In this sample the contractor's mean profit loss was 23% a year, and the authors say the true loss may be higher because rework was seldom documented.
Ibbs, ASCE Journal of Legal Affairs and Dispute Resolution, 2011 Data from two independent research studies About 40% of projects had more than 10% change. Productivity beat planned rates on 60% of projects when change stayed under 5%, and never reached plan once change passed 20%.

Specialty trades feel the same problem from the other side. A 2022 Dodge Data & Analytics and Procore survey of 537 specialty contractors found that, on average, 32% of project revenue was lost to changes that went unbilled and unpaid. Among large companies, 31% lost more than half their project revenue to those changes (Dodge and Procore, 2022). Those losses land on you as delays, disputes and subs asking for more money.

Cash is the other leak. In a 2020 survey of more than 540 construction businesses, 62% blamed project delays on unexpected change orders, and 49% said they typically waited more than 30 days to get paid. 81% spent a moderate or substantial amount of time chasing payments (Levelset, 2020).

Why unsigned changes keep happening

The causes are rarely about bad intent. They come from how work moves on a job:

  • The request comes in the hallway. The owner or architect asks for a small change on site, and the superintendent says yes to keep the schedule moving.
  • Schedule pressure beats paperwork. Dodge found 97% of trade contractors begin some change orders before approval, and 77% have had to write off unapproved or downward-negotiated change orders as bad debt (Dodge and Clearstory, 2026).
  • Price comes after the work. An FMI interviewee at a $360 million general contractor described the result: proceed without formal approval, and "the client gets sticker shock, and the amount gets adjusted" (FMI, 2026).
  • Sub changes don't match yours. A change your sub prices never makes it into the owner's change order, so you pay the sub and absorb the difference.
  • Nobody owns the log. Changes sit in texts and site notes, and they miss the next pay application. Levelset's guidance is that pay applications should include approved change orders, and that including unapproved ones can delay approval (Levelset, change order guide).

The systems that fix it

For general contractors, the fix is a path every change follows before a crew moves. This is the same idea as owner out of operations for trades, applied to change orders.

One change request, started in the field

Give superintendents one form they can fill out on a phone. It records what changed, photos, who asked and the date. Each request gets a number and reaches the project manager the same day, so nothing lives in a text thread.

Price and sign before work starts

Each request gets a priced change order with cost, schedule impact and the sub quote attached, then a signature from the owner. Make the rule a hard stop: no signed number, no crew assignment and no material order. FMI found the most reliable performers hold one standard, that no work proceeds without written authorization.

When you approve a change, the matching sub change order is created at the same time. Your markup stays visible, and the sub is paid only from the amount that was approved with the owner.

Feed every pay application from one log

Approved changes flow into the next pay application automatically. Pending items stay off it, listed separately with the reason. Collections start from a clean record instead of a pile of texts.

Review cost to complete every week

Once a week, the PM and owner look at the original contract, approved changes, pending requests and cost to complete. FMI reports that firms with the most rigorous cost forecasting hit their budgeted profit 92% of the time, and that is a review most small GCs can run in 30 minutes.

What to set up this week

  1. Pull every change order from your last two jobs. Count how many were signed before the work started.
  2. Add up the pending items that have no signed number. That is your current exposure.
  3. Write a one-page rule: no signed change number, no crew assignment or material order.
  4. Create one change request form that a superintendent can fill out on a phone.
  5. Ask each active sub to price changes through the same form, with the sub quote attached.
  6. Put approved changes on the next pay application and list pending ones separately.
  7. Book a 30-minute Friday review of contract value, approved changes and cost to complete.

How Sotena builds this

Sotena Group builds the CRM, automations, workflows and SOPs behind this for established general contractors. We map how a change starts, gets priced and reaches billing on your jobs, then set up request forms, approval steps, sub change tracking and weekly reporting around how your PMs and superintendents work. The goal is a change that gets signed before it gets built, without you chasing paper at the end of the job.

Sources

See How Sotena Can Help

New York skyline at night with the Sotena mark on a tower

Get your time back.

About two minutes of questions shows where your business gets stuck and what to fix first.

Prefer email? info@gosotena.com